Target spectrum

Post by meerajacob »

Hi,
In seismoselect, while defining target spectrum as per IS 1893 (Part 1), what do the terms 'rest category, 'bussiness continuity category' and critical category' imply? In what category does the arch bridge fall? Also, while selecting for design/ inelastic spectrum according to IS 1893(part 1), what extra value should be inputted?

TIA
Meera Jacob
User avatar
seismosoft
Posts: 1246
Joined: 06 Jul 2007, 04:55

Re: Target spectrum

Post by seismosoft »

These are all parameters of the Indian Standard. Their detailed description should be given in the code. It is up to the engineer to decide which are the exact parameters that are to be passed as SeismoSelect input.

Seismosoft Support