Plastic hinges
Posted: 24 Jan 2009, 21:09
Hi,
I have a few question about the seismostruc.
Type of structure: Steel
Bays : 3@6m
Storey : 4
Tool : Pushover analysis
I try to check the plastic hinges for my stucture. What i know, the moment is going to decrease with height of the building. So, the plastic hinges should occurred at 1st level, unfortunately, its occured at 3 level and followed by another level.
Im using strong column - weak beam method.
1. How can i check the value of moment for each beam.
2. I set the material strain with a default value 0.020. So its going to notify every time it higher than 0.020. So during the analysis, for example its notify me by starting with bmx3144,bmx3141 and till finish. So i assume that, the first plastic hinge occured at bmx3144 followed by others. It is right way to check it?
Thank you.
I have a few question about the seismostruc.
Type of structure: Steel
Bays : 3@6m
Storey : 4
Tool : Pushover analysis
I try to check the plastic hinges for my stucture. What i know, the moment is going to decrease with height of the building. So, the plastic hinges should occurred at 1st level, unfortunately, its occured at 3 level and followed by another level.
Im using strong column - weak beam method.
1. How can i check the value of moment for each beam.
2. I set the material strain with a default value 0.020. So its going to notify every time it higher than 0.020. So during the analysis, for example its notify me by starting with bmx3144,bmx3141 and till finish. So i assume that, the first plastic hinge occured at bmx3144 followed by others. It is right way to check it?
Thank you.