Different Integration Sections results
Posted: 06 Feb 2012, 15:01
I' m running a static pushover analysis.
The elememt classes I had where separated in 5 Integration Sections when I run the analysis.
But as my structure's elements where subdivided in 4 different sections I changed the value to 3 Intergration Sections to all element classes.
The results I had weren't the same.
Increased values occured (about 10% increasement).
Why is that happening?
The elememt classes I had where separated in 5 Integration Sections when I run the analysis.
But as my structure's elements where subdivided in 4 different sections I changed the value to 3 Intergration Sections to all element classes.
The results I had weren't the same.
Increased values occured (about 10% increasement).
Why is that happening?