Increasing Ductility Demand
Posted: 11 May 2021, 09:30
Hi dear all,
I just wanted to ask if anyone could give me some advice in order to increase the ductility demand in my RC-structure using the SeismoStruct software:
It´s a 3-storey frame with 3-bays in the x-direction.
Column sections are modelled 30x30cm with C30/37 (con_ma) and reinf. is modelled with S500 (stl_mp):
- longitudinal reinforcement is 8x16mm,
- transverse reinforcement is 2 and 2 with diamond stirrups
- hoops 12mm-0,1m.
The beam sections have dimension of 30x40cm with C25/30 and are also reinforced with S500.
- longitudinal reinf. is 4x12mm,
- transverse reinf. is 2 and 2
- hoops 10mm-0,1m.
Masses are modelled with lumped masses (8t/edge). Rigid diapgrams are used in every floor. Applied loads for the pushover analysis are 5kN for the first, 10kN for the second and 15kN for the third storey. Maximum displacement =0,5m in order to reach umax, maybe to much? Target displacement is calculated based on EC8.
When I run now the static pushover analysis the structure reaches a umax of 0,3350m (3,7% of total height). How do I define the uy (yield displacement). Should I use the uy of the idealized curve or from the real one? When I do this I have 0,3350/0,0826 = 4,06. When I use the real curve I have 0,3350/0,1350= 2,48.
PS. When I have a look on the deformed shape, it looks like there is only hinges on the column ends of the first floor. There are no plastic hinges on the beams. Thank you very much, I would very appreciate some advice!
I just wanted to ask if anyone could give me some advice in order to increase the ductility demand in my RC-structure using the SeismoStruct software:
It´s a 3-storey frame with 3-bays in the x-direction.
Column sections are modelled 30x30cm with C30/37 (con_ma) and reinf. is modelled with S500 (stl_mp):
- longitudinal reinforcement is 8x16mm,
- transverse reinforcement is 2 and 2 with diamond stirrups
- hoops 12mm-0,1m.
The beam sections have dimension of 30x40cm with C25/30 and are also reinforced with S500.
- longitudinal reinf. is 4x12mm,
- transverse reinf. is 2 and 2
- hoops 10mm-0,1m.
Masses are modelled with lumped masses (8t/edge). Rigid diapgrams are used in every floor. Applied loads for the pushover analysis are 5kN for the first, 10kN for the second and 15kN for the third storey. Maximum displacement =0,5m in order to reach umax, maybe to much? Target displacement is calculated based on EC8.
When I run now the static pushover analysis the structure reaches a umax of 0,3350m (3,7% of total height). How do I define the uy (yield displacement). Should I use the uy of the idealized curve or from the real one? When I do this I have 0,3350/0,0826 = 4,06. When I use the real curve I have 0,3350/0,1350= 2,48.
PS. When I have a look on the deformed shape, it looks like there is only hinges on the column ends of the first floor. There are no plastic hinges on the beams. Thank you very much, I would very appreciate some advice!