Re: Pushover Analysis Error
Posted: 04 Apr 2024, 16:40
Dear Huffte,
thanks for your response, i have already encountered the above two scenarios that you have hilighted i have assign the strain values of Life safety to Immidate occupancy level but still that problem happen. Analysis get terminated after achieving the maximum base shear value and the failure at that point was just spalling of concrete from beam and columns.if anything else you can suggest.
Dear huffte i would like to have your comments on couple of points.
1) In Pushover analysis=>Nodal load=> incremental load=>type =force and displacement.what is the difference in selecting the force and displacement option bcz when i select displacement opt, program gives this pop-up(Zero diagonal encountered at the following nodes)before running the analysis, while when i select force opt porgram does not give any such pop-up before running the analysis.So whats d/f B/w these 2 and which one should use?
2) I first restrained the control nodes of each floor in x and Y dir only, the above warning message was apears so when i restrained the control nodes in all X+Y+Z+RX+RY+RZ dir my analysis run completely,no warning message appears but the T.P of my structre reduces to the half. if firstly it was 0.78 sec after doing this it comes out to 0.34 sec.why is it so?my orignal T.P of str 0.78 which matches to the Etabs value is now changed?why?Now which T.P i should use in order to find Target displacement?
Regards.
thanks for your response, i have already encountered the above two scenarios that you have hilighted i have assign the strain values of Life safety to Immidate occupancy level but still that problem happen. Analysis get terminated after achieving the maximum base shear value and the failure at that point was just spalling of concrete from beam and columns.if anything else you can suggest.
Dear huffte i would like to have your comments on couple of points.
1) In Pushover analysis=>Nodal load=> incremental load=>type =force and displacement.what is the difference in selecting the force and displacement option bcz when i select displacement opt, program gives this pop-up(Zero diagonal encountered at the following nodes)before running the analysis, while when i select force opt porgram does not give any such pop-up before running the analysis.So whats d/f B/w these 2 and which one should use?
2) I first restrained the control nodes of each floor in x and Y dir only, the above warning message was apears so when i restrained the control nodes in all X+Y+Z+RX+RY+RZ dir my analysis run completely,no warning message appears but the T.P of my structre reduces to the half. if firstly it was 0.78 sec after doing this it comes out to 0.34 sec.why is it so?my orignal T.P of str 0.78 which matches to the Etabs value is now changed?why?Now which T.P i should use in order to find Target displacement?
Regards.