Dears at Seismosoft,
When i create a model in building modeler and choose type of analysis : Dynamic History Analysis and when i press exit and create project i am asked to load an accelerogram file which i have to define the scale factor but afterwards when i go to applied load i found another ...
Search found 2 matches
- 20 Jan 2018, 15:26
- Forum: 03-Analytical/modelling capabilities
- Topic: Accelerograms Scale factor
- Replies: 1
- Views: 9528
- 19 Dec 2017, 01:35
- Forum: 03-Analytical/modelling capabilities
- Topic: Dynamic Time History Analysis
- Replies: 1
- Views: 2422
Dynamic Time History Analysis
Dears at Seismosoft ,
I am trying to perform Dynamic Time History analysis for a multi-story building with RC Shear walls .
At some point the analysis terminates and it gave me a message says " unable to apply next load step. Analysis terminated "
What could be the problem and how could i ...
I am trying to perform Dynamic Time History analysis for a multi-story building with RC Shear walls .
At some point the analysis terminates and it gave me a message says " unable to apply next load step. Analysis terminated "
What could be the problem and how could i ...
