Search found 4 matches
- 09 May 2017, 08:33
- Forum: 03-Analytical/modelling capabilities
- Topic: seismoBatch facility error
- Replies: 1
- Views: 3203
seismoBatch facility error
I used seismoBatch facility to run the pushover analysis of a structure. In the text output, a message in the front of "Load factor" was appear: Response item not found. Please let me know how can solve this problem.
- 09 May 2017, 07:34
- Forum: 03-Analytical/modelling capabilities
- Topic: Different between periods
- Replies: 3
- Views: 6105
Re: Different between periods
Thank you for your answer. I create the model by Building modeller. So, the mass calculated based on additional mass and assign to all of the beams automatically. In the ETABS, I used end-offset (0.5), but in seismo, It was calculated automaticaly. The ETABS file analyzed based on 0.5 and 1 for ...
- 08 May 2017, 15:55
- Forum: 03-Analytical/modelling capabilities
- Topic: Different between periods
- Replies: 3
- Views: 6105
Different between periods
I have a 3D-RC frames. The period which was determine from the ETABS is 0.87, while in seismoStruct based on eigenvalue analysis, it was calculated 0.54. What is the reason for this difference? I didn't change the default of the program.
- 04 May 2017, 05:36
- Forum: 03-Analytical/modelling capabilities
- Topic: Pushover a beam
- Replies: 1
- Views: 3089
Pushover a beam
I want to push a RC beam for a vertical load. I have several question. Please answer:
1- Can I create and analysis only a horizontal RC beam without any column?
2- I was prefer to assign a distributed vertical incremental load to whole length of the beam. But, there is no option for this. So, I ...
1- Can I create and analysis only a horizontal RC beam without any column?
2- I was prefer to assign a distributed vertical incremental load to whole length of the beam. But, there is no option for this. So, I ...